Home · Guides · Permits for Kitchen and Bath Renovations in Ottawa
Guide · 24 November 2026
When an Ottawa kitchen or bathroom needs a building permit
The City publishes the line. Cabinets can be exempt. Moved plumbing and new walls are not.
By Dream Kitchen and Bath · 24 November 2026 · Ottawa
In the City of Ottawa, replacing kitchen or bathroom cabinets does not need a building permit if the plumbing fixtures stay in the same place. Adding or removing walls, enlarging or moving a window or door, or altering plumbing does. The owner is responsible for the permit. Dream Kitchen and Bath will not invent an exemption. Call (613) 863-7901 to talk about the scope, and read the City’s pages linked below.
What the City lists as exempt
On “Projects not requiring building permits,” the City of Ottawa includes replacing kitchen or bathroom cabinets, provided plumbing fixtures remain in the same location, and new flooring. The same page says exempt work must still comply with the Ontario Building Code and zoning. Designated heritage buildings, or buildings in a heritage overlay, are not given those exemptions. If that might be your house, contact the City before you rely on the list.
Page: Projects not requiring building permits.
What needs a permit
On “Building permit projects,” the City lists interior structural alterations, including adding or removing walls, new or enlarged or relocated windows and doors, and plumbing alterations, additions, or extensions, except replacing existing fixtures. That is the line between a cabinet swap and a kitchen that moves the sink or opens to the living room.
Page: Building permit projects.
Finishing a basement is called out on its own page. The City says a permit is required for that kind of alteration and describes inspections that can include plumbing, framing, insulation and vapour barrier, and a final inspection. Book inspections ahead. The plans need to be on site.
Page: Finishing a basement.
Who applies, and who does not regulate electrical
The City’s permit FAQ says it is the owner’s responsibility to ensure a permit is obtained when required. You may authorize a contractor to apply. Both the owner and the contractor are responsible under the Building Code Act. Many owners submit the application themselves so they hear the answers directly.
The same FAQ says the City does not regulate electrical installations, and a building permit is not required for work that is exclusively electrical. That does not mean electrical work is unregulated. It means the City’s building permit is the wrong instrument for an electrical-only job.
FAQ: Building permits — frequently asked questions.
If you are unsure, the City tells you to contact the Building Code Client Service Centre, call 3-1-1, or email buildingpermits@ottawa.ca. We will not override that with a blog post.
Embrun is not the City of Ottawa
Embrun is in the Township of Russell. Do not use the City of Ottawa exemption list there until the township agrees. Our Embrun page says the same thing. Everywhere else in our service list on this site is inside the City of Ottawa.
When you know the scope, the kitchen and bathroom pages describe the work, and (613) 863-7901 is the phone.