What a bathroom renovation timeline actually includes

The calendar is design, ordering, demolition, rough-in, board, tile, and fixtures. The number of weeks depends on what moves.

By Dream Kitchen and Bath · 24 November 2026 · Ottawa

A bathroom renovation runs design, ordering, demolition, rough-in, backer board, tile, then fixtures and glass. Dream Kitchen and Bath will not quote you “two weeks” as a city-wide fact. Call (613) 863-7901 and we will schedule the bathroom you have.

Before anyone shuts the water off

The slow part is often before demolition. You choose the vanity, the tile, and the glass. Those items have lead times. A frameless panel is not a stock item in every size. A vanity that is 36 inches may not exist for a 34-inch wall. Settling this on paper is faster than settling it with the old tub already in a bin.

If the bathroom is the only one, the plan has to say where people will wash. That is a scheduling fact, not a slogan. Powder rooms and ensuites change the answer. Say which rooms you have when you call.

The sequence on site

Demolition comes first, and it tells you if the floor or the wall behind the tub is worse than it looked. Rough-in is next: plumbing and, if the fan or the lights move, electrical. Inspections sit in this gap when a permit is open. The City of Ottawa asks people to book inspections ahead. Covering work before it is seen can mean opening it again.

Then backer board and waterproofing, then tile, then a wait for the tile to be ready for glass and for the toilet and vanity. Paint and trim are last, because they get wrecked if they go in early. Glass measured before the tile is flat is a glass order that does not fit.

What makes it longer

Moving the shower or the toilet. A permit and its inspections. Custom glass. Tile that is small and needs more time to install. A floor that has to come up because the old tub leaked. A condo rule that limits the hours hammers can run. None of these are reasons to invent a single Ottawa timeline. They are reasons your timeline is yours.

The City’s permit line is on our permit guide. The scope of a bathroom quote is on the bathroom renovation page. To start, call (613) 863-7901 or send the quote form.