Home · Guides · Ottawa Kitchen Renovation Planning Guide

Guide · 24 November 2026

How to plan a kitchen renovation in an Ottawa house

Measure the doors, decide if the sink stays put, and read the City’s permit line before you fall in love with a door style.

By Dream Kitchen and Bath · 24 November 2026 · Ottawa

Plan an Ottawa kitchen by measuring the room, deciding whether the sink and the walls stay put, and only then choosing cabinets and a counter. Dream Kitchen and Bath can quote the result. Call (613) 863-7901. This guide does not include prices.

Start with the house, not a photo

Ottawa kitchens come from different decades. A Nepean kitchen from the 1970s is often a closed room. A Barrhaven kitchen from 2008 is often already open to the family room. A Kanata two-storey from the 1990s is often somewhere between the two. The photo you saved is not the constraint. The door swings, the window, and the stack are.

Measure the full length of each wall, the ceiling height, the width of every doorway, and the distance from the sink to the stove and the fridge. Note what is in the corners. Corners are where stock cabinet runs die. Photograph the electrical panel if a hood or extra circuits might be needed. The City of Ottawa does not issue building permits for electrical work alone. Electrical rules sit with the Electrical Safety Authority. The City says so on its building-permit FAQ.

Decide what is allowed to move

Write two lists. On the first, the sink, the stove, and the fridge stay. Cabinets, the counter, the light, and the backsplash change. On the second, the sink moves or a wall opens. The first list is often the City of Ottawa cabinet exemption: replacing cabinets does not need a building permit when plumbing fixtures remain in the same location. The second list is a permit project. Read the permit guide and the City’s own pages before you tell a cabinet shop to build to a new sink location.

If a wall might come out, do not assume it is free of structure because it feels thin. Kitchens next to dining rooms in 1960s and 1970s houses sometimes have a beam already, and sometimes they have a wall that is holding the floor above. That is a site question, not a Pinterest question.

Cabinets and the counter, in that order

Choose the layout, then the cabinet boxes, then the counter. The counter depends on the cabinet depths and on where seams can fall. A seam through the middle of a sink run is a mistake you will touch every day. Our countertop guide covers heat, water, and upkeep without inventing a price.

Order time is part of the plan. If the doors are made to order, the kitchen cannot be demolished the week you sign, unless you are prepared to live without a kitchen while a shop builds. We would rather set the demolition date after the cabinets have a delivery week.

What to have ready when you call

The address, which community the house is in, whether you own a condo with work rules, and whether this is the only kitchen. A few photos. A sentence on what fails today: not enough counter by the stove, a fridge that blocks a door, a dishwasher that was never plumbed in. Call (613) 863-7901 weekdays from 9:00 a.m. to 5:00 p.m., or use the free quote form. The kitchen renovation page describes the work. We do not publish a rate card.

Other guides

Call (613) 863-7901 Free Quote
Call (613) 863-7901
Recent project