How long does a kitchen renovation take in Ottawa?
Most of the calendar is not demolition and construction. It is decisions, ordering, and waiting for cabinets and counters. Here is how the time breaks down, and what you can do to shorten it.
By Dream Kitchen and Bath · 24 November 2026 · Ottawa
A kitchen renovation in Ottawa takes longer on the calendar than on site. Timeline guides published by Ottawa renovation companies in 2026 commonly put the on-site work for a full kitchen at roughly 4 to 8 weeks, and the whole project, including design and ordering, at around 3 to 5 months. A same-layout cabinet and counter replacement is shorter; moving walls or plumbing is longer. For a schedule for your kitchen, call Dream Kitchen and Bath at (613) 863-7901.
1. Design and decisions
Layout, cabinet line, door style, counter material, sink, faucet, appliances, backsplash, lighting, and flooring all need to be chosen before anything is ordered. This is the stage you control most. Undecided items are the most common reason a kitchen takes longer than planned. Our planning guide lists what to decide first.
2. Ordering cabinets
Cabinets are usually the longest lead item. In-stock and flat-pack lines can arrive quickly. Semi-custom and custom cabinets are built to order and take weeks. We schedule demolition from the confirmed cabinet delivery date, so you are not without a kitchen while waiting for boxes.
3. Permits, when needed
If the sink moves, plumbing is added, or a wall comes out, a City of Ottawa building permit is needed. The City’s published target for a first review of a complete permit application for a house is 10 business days. Incomplete applications take longer, and an engineer’s drawing for a beam adds time before you can apply. A same-layout cabinet replacement is on the City’s list of projects that do not need a permit.
4. Demolition and rough-in
Removing the old kitchen is quick. Rough-in is when plumbing, gas, and electrical are moved or added, and inspections happen if there is a permit. In older Ottawa houses, this is also when surprises show up: old wiring, galvanized pipe, or an uneven floor. Each needs fixing before cabinets go in.
5. Drywall, paint, and flooring
Patching or new drywall, priming, and often flooring go in before the cabinets. Drywall compound needs drying time between coats.
6. Cabinets, then counters
Cabinet installation usually takes days, not weeks. Stone and quartz counters are templated only after the base cabinets are level and fixed, then cut and installed on a later visit. That wait is one reason a temporary counter or a working sink in another room helps. See cabinet installation and countertop installation.
7. Backsplash, fixtures, and finishing
Backsplash tile goes on after the counter, then the sink, faucet, appliances, lighting, and trim. A final walk-through catches adjustments.
How to keep it shorter
- Make every selection before ordering, and avoid changes after.
- Keep plumbing in place if the layout works.
- Choose in-stock items where a long lead time does not buy you much.
- If a permit is needed, apply as soon as the design is final, while the cabinets are being built.
- Set up a temporary kitchen: a fridge, microwave, kettle, and a sink nearby.